Back to top

Pietak, Lynn Marie

Report Number Author(s) Title Abstract Summary County Year
2619 Pietak, Lynn Marie Phase I Archaeological Survey of the Johns Creek Multi-Use Greenway Trail, Fulton County, Georgia

The majority of the Johns Creek Multi-Use Greenway Trail runs along Medlock Bridge Rd. (SR 141). The project is approximately 4.7 miles long and begins at the intersection of Findley and Medlock Bridge roads.

Fulton 2004
2648 Pietak, Lynn Marie Phase I Archaeological Survey of Perimeter Center Parkway Sidewalk Project, DeKalb County, Georgia.

The project would consist of the installation of pedestrian paths along the east side of Perimeter Center Parkway from Hammond Drive to Perimeter Center West Parkway. Project length is 0.5 mile.

DeKalb 2004
2671 Duff, Eric Anthony, Pietak, Lynn Marie Phase I Archaeological Survey of Eight Signal Design Project Areas in Early County, Georgia

The project consists of reconstructing the existing signalization at eight intersection locations in the town of Blakely. Early County (list attached). Signal mast arms, poles, ramps/crosswalks, controller cabinets, and fiber optic interconnections would bz included.

Early 2004
2707 Pietak, Lynn Marie Phase I Archaeological Survey of the Greene County Regional Airport Expansion Project Area, Greene County, Georgia

In February 2004, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location of the Greene County Regional Airport expansion project.

Greene 2004
2718 Duff, Eric Anthony, Pietak, Lynn Marie Phase I Archaeological Survey of Seven Signal Design Project Areas In Laurens County, Georgia

The project would entail traffic signal upgrades at seven intersections in Laurens County (City of Dublin and City of East Dublin).

Laurens 2004
2724 Duff, Eric Anthony, Pietak, Lynn Marie Phase I Archaeological Survey of 15 Signal Design Project Areas in Dougherty County, Georgia

The project consists of reconstructing the existing signalization at 15 intersection locations in Dougherty County (list attached).

Dougherty 2004
2725 Duff, Eric Anthony, Pietak, Lynn Marie Phase I Archaeological Survey of Sixteen Signal Design Project Areas in Walker and Whitfield Counties, Georgia

None Present.

Walker 2004
2743 Pietak, Lynn Marie Phase I Archaeological Survey of ITS Enhancement, Phase 4, Traffic Signal Timing System Installation, Cobb County, Georgia

The project would consist of the installation of a communication backbone of fiber optic cable. Closed Circuit Television Cameras would be installed at specified locations for traffic surveillance and connected by fiber optic cable with the Cobb County TCC.

Cobb 2004
2753 Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed Cumming Park and Ride Facility Project Area, Forsyth County, Georgia

In July 2004, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed Cumming Park and Ride Facility project area in Forsyth County, Georgia. The project area encompasses approximately 8.5 acres.

Forsyth 2004
2756 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 74/85 Bridge Over White Oak Creek, Meriwether County, Georgia

Original Description: The proposed project would replace the existing bridge with a new 44-foot wide concrete bridge that is approximately 360 feet in length. The proposed bridge would accommodate two 12-foot travel lanes and two 10-foot shoulders.

Meriwether 2004
Displaying 31 - 40 of 538