2898 Pietak, Lynn Marie Phase I Archaeological Survey for SR 124 ITS Project Area, Gwinnett County, Georgia

None Present.

Gwinnett 2004
2943 Pietak, Lynn Marie Addendum to the Phase I Archaeological Survey of Proposed Improvements to the Dawson Forest Road and Lumpkin Campground Road Intersection, Dawson County, Georgia

The proposed project would construct a roundabout at the intersection with flares extending back 200 to 300 feet alone each leg from the intersection's center. The proposed typical section would consist of two.

Dawson 2004
2945 Pietak, Lynn Marie Addendum to Archeological Survey of Two Proposed Bridge Replacements: SR 74/85 over Red Oak Creek and White Oak Creek, Meriwether, Georgia

On June 18, 2004, staff from Edwards-Pitman Environmental, Inc. (EPEI) revisited the location of a proposed bridge replacement project in eastern Meriwether County, Georgia. (Figure 1). The bridge is located on State Route 74 and 85 (SR 74/85) and crosses Red Oak Creek.

Meriwether 2004
2962 Silliman, Garrett W., Pietak, Lynn Marie Addendum to Intensive Archaeological Field Survey if the Cobb Creek Bridge Replacement, Toombs County, Georgia

As the result of recent design changes, the proposed project would begin approximately 1,315 feet west of Cobb Creek and end approximately 1,361 feet east of Cobb Creek, for a total project length of approximately 2,675 feet (0.50 mile).

Toombs 2005
2964 Silliman, Garrett W., Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of CR 107/Howell Bridge Road Over Sharp Mountain Creek, Cherokee County

Original: The proposed project would replace the existing bridge over Sharp Mountain Creek with a new 200-foot long and 38-foot wide bridge on new alignment located to the north, but adjacent to the existing bridge.

Cherokee 2005
2969 Pietak, Lynn Marie Addendum to An Archeological Survey of the Proposed Bridge Replacement: SR 16 Over Rooty Creek, Putnam County, Georgia

Original Project APE: the proposed project would replace the existing bridge with a new bridge approximately 52-feet wide. The new bridge would accommodate two 12-foot wide travel lanes separated by a 12-foot flush median, two 6-foot wide sidewalks, and two 2-foot gutters.

Putnam 2005
2970 Pietak, Lynn Marie Phase I Archaeological Survey of the Atlanta Smart Corridor Project Area, Cobb and Fulton Counties, Georgia

The Atlanta Smart Corridor Project would be an innovative approach to managing traffic and transit operations.

Fulton 2005
2977 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Improvements to SR 16, Putnam County, Georgia

Original: The proposed project would resurface, re-stripe and widen SR 16. SR 16 would be widened six feet symmetrically with curb and gutter. Sidewalks would be installed from South Maple Street on both sides to east of the Rooty Creek bridge.

Putnam 2005
2978 Pietak, Lynn Marie Phase I Archaeological Survey of SR 81 at Racetrack Road, Henry County, Georgia

The proposed project is located at the intersection of SR 81 and CR 376/Racetrack Road. The proposed project length is approximately 0.3 miles. The project along SR 81 would widen the roadway 12 feet on the northbound side to provide for a left turn lane.

Henry 2004
2980 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 156 Bridge Replacement Over John's Creek, Floyd and Gordon Counties, Georgia

The proposed project would replace the existing bridge with a new 3-span concrete bridge that is approximately 40-foot wide and 330 feet long. The proposed bridge would accommodate two 12-foot travel lanes and two 6-foot shoulders.

Floyd 2005