Back to top

Pietak, Lynn Marie

Report Number Author(s) Title Abstract Summary County Year
2981 Pietak, Lynn Marie Phase I Archaeological Survey of Glenwood Road at I-285 Improvements Project Area, DeKalb County, Georgia

The proposed project would consist of improvements to SR 260/Glenwood Road at 1-285. These improvements would include re-striping Glenwood Road and constructing a raised median on the east side of the interchange.

DeKalb 2004
2982 Pietak, Lynn Marie Phase I Archaeological Survey of Covington Highway @ I-285 Improvements Project Area, DeKalb County, Georgia

The proposed project would consist of improvements to SR 12/US 278/Covington Highway @ 1-285. These improvements would include the construction of an additional right turn lane on the 1-285 northbound off-ramp and would increase the storage length to the 1-285 southbound off-ramp turn lanes.

DeKalb 2004
2983 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Intersection Improvement of SR 166 at SR 5, Douglas County, Georgia

The Concept Report originally showed the project length to be 0.46 mile. The new plans show the project length to be 0.99 mile. Total project length has increased by approximately 0.53 mile: an increase of 0.25 mile on SR 5 and an increase of 0.28 mile on SR 166.

Douglas 2005
2986 Pietak, Lynn Marie Phase I Archaeological Survey for the Widening of West Bay Street, Savannah, Chatham County, Georgia

The proposed project would improve a portion of SR 25CO/Bay Street, located in Savannah, Chatham County, Georgia. The project would begin at West Lathrop Avenue and end at East Lathrop Avenue.

Chatham 2004
3003 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Eagle's Landing Parkway from Village Center Parkway to East of Talon Place (East Lake Parkway), Henry County, Georgia

Original Project Description: this project proposes widening Hudson Bridge Road/Eagles Landing Parkway from Jodeco Road through the intersection with US23/SR42 to Talon Place with an exception from 1200' west of the I-75/SR401 southbound ramps to Village Center Parkway.

Henry 2005
3004 Pietak, Lynn Marie Phase I Archaeological Survey of SR 284 over the Chattahoochee River Bridge Replacement Project Area, Hall County, Georgia

The proposed project would consist of replacing the bridge on SR 284 over the Chattahoochee River in Hall County. The total project length would be approximately 2,900 feet, beginning at M.P. 1.63 and extending to M.P. 2.18.

Hall 2005
3005 Pietak, Lynn Marie Phase I Archaeological Survey of SR 11/US 129 at Pat Colwell road and Pat Haralson Drive Intersection Improvements Project Area, Union County, Georgia

The proposed project would consist of constructing exclusive left turn lanes onto CR 100/Pat Colwell Road and CR 200/Pat Haralson Drive, with a 610-foot long two-way left turn lane.

Union 2005
3006 Pietak, Lynn Marie Phase I Archaeological Survey of Nine Intersection Safety Improvements Project Areas Along Austell Road, Cobb County, Georgia

The proposed project would consist of safety improvements to nine intersections located on Austell Road/S.R. 5, from Clay Road extending north to Sandtown/Olive Spring Road, all in Cobb County, Georgia (see attached Figures 1A and 1B).

Cobb 2005
3008 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 216 over Carter Creek, Randolph County, Georgia

Original: The proposed project would also involve the realignment of SR 216 east of its current location for a distance of approximately 4,192 feet. As a result, the new bridge structure would be located approximately 85 feet east of the current bridge.

Randolph 2005
3010 Pietak, Lynn Marie Phase I Archaeological Survey of ATMS Fiber Optic Line Route along the Lawrenceville/Suwanee Highway, Gwinnett County, Georgia

The Lawrenceville-Suwanee Road ATMS project expands upon the current Intelligent Transportation Systems (ITS) in Gwinnett County.

Gwinnett 2005
Displaying 81 - 90 of 538