1133
|
Joseph, Joseph W., Hamby, Theresa M.
|
A Phase I Archaeological Survey of the SR120 Extension
|
On December 2, 1992, New South Associates conducted a Phase I archeological survey of the SR 120 extension in Alpharetta for Moreland Altobelli Associates, Inc.
|
Fulton
|
1992
|
1153
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey of Various Interchanges and Improvements to I-85 Gwinnett County, Georgia
|
New South Associates conducted a Phase I archeological survey of various interchanges and Improvements to I-85 from October 21 through October 26, 1992 and March 17 and 18, 1993.
|
Gwinnett
|
1993
|
1154
|
Joseph, Joseph W.
|
Phase I Archaeological Survey of Eleven Proposed Bridge Replacements in Coweta County, Georgia
|
New South Associates conducted a Phase I archeological survey of eleven proposed bridge replacements in Coweta County from April 6 through April 12, 1993. The project area consists of the limited right-of-way surrounding each existing bridge in various locations throughout Coweta County.
|
Coweta
|
1993
|
1155
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey of the Proposed Sugarloaf Parkway
|
New South Associates conducted a Phase I archeological survey of the proposed Sugarloaf Parkway at I-85 from October 21 through October 26, 1992 and March 17 and 18, 1993.
|
Gwinnett
|
1993
|
1172
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey of the Suwanee Bypass
|
New South Associates conducted a Phase I archeological survey of the proposed Suwanee Bypass on March 22 and 23, 1994. The project area is approximately 2.2 miles of new alignment with a right-of-way of 160 feet.
|
Gwinnett
|
1994
|
1197
|
Joseph, Joseph W., Hamby, Theresa M.
|
A Phase I Archeological Survey of the Ivy Little Creek Interceptor Sewer
|
On August 26, 1994, New South Associates conducted a Phase I archaeological survey of 3, 950 feet of the proposed Ivy/Little Ivy Creek interceptor sewer system in Gwinnett County, Georgia.
|
Gwinnett
|
1994
|
1217
|
Joseph, Joseph W.
|
CRM: Vogtle Effingham-Thalman 500kv Electric Transmission Line GP-LI-01: Data Recovery
|
Archaeological data recovery at Georgia Power Cultural Property LI-O1 was conducted during the winter and spring of 1985. This multi-component site proved to be badly disturbed by natural and cultural forces, but nonetheless yielded a rich material culture.
|
Liberty
|
1986
|
1228
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase 1 Archeological Survey of Seven Proposed Bridge Replacements in Coweta County, Georgia.
|
New South Associates conducted a Phase I archaeological survey of seven proposed bridge replacements in Coweta County on August 23 and 24, 1994. The project area consists of the limited right-of-way surrounding each existing bridge in various locations throughout Coweta County.
|
Coweta
|
1998
|
1260
|
Joseph, Joseph W.
|
Phase I Archaeological Survey of the Lithonia Industrial Boulevard Realignment
|
New South Associates conducted a Phase I Archaeological Survey of the proposed realignment of Lithonia Industrial Boulevard in DeKalb County, Georgia on March 22, 2007.
|
DeKalb
|
2007
|
1270
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey of Old Tails Creek Road, Gilmer County, Georgia
|
New South Associates conducted a Phase I archaeological survey of the proposed Old Tails Creek Road widening and paving on January 24 and 25, 1995. The project corridor is approximately 2.04 miles in length and contains a 100 foot right-of-way.
|
Gilmer
|
1995
|