Back to top

Joseph, Joseph W.

Report Number Author(s) Title Abstract Summary County Year
1273 Joseph, Joseph W. Phase I Archaeological Survey of the Proposed Wrightsboro Road Widening and Thompson West Bypass

New South Associates conducted a Phase I archeological survey of the proposed Wrightsboro Road widening and the Thomson West Bypass on April 18 through April 22, 1994. The Wrightsboro Road widening is approximately 4 miles long with a right-of-way of 80 to 90 feet.

McDuffie 1994
1345 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey of Intersection Improvement at Rays Road and East Ponce De Leon Avenue

On March 13, New South Associates conducted a Phase I Archaeological Survey of the proposed intersection improvement at Rays Road and East Ponce de Leon Avenue, DeKalb County, Georgia. The project consisted of approximately 0.44 mile of widening along East Ponce de Leon Avenue.

DeKalb 1995
1350 Joseph, Joseph W. Phase I Archaeological Survey of Three Detention Ponds and a Cemetery Delineation on Old Alabama Road

On October 10-11, 2007, New South Associates conducted an archaeological survey of three proposed to water detention facilities on Old Alabama Road in Bartow County. The project is intended provide water detention facilities during the reconstruction of Old Alabama Road.

Bartow 2007
1434 Joseph, Joseph W. An Archeological and Architectural Historical Survey of the Proposed South Dalton Bypass, Whitfield County, Georgia

This report addresses the results of an archeological and architectural historical survey of a 4.75 mile planned bypass corridor located to the south and east of Dalton, Georgia.

Whitfield 1992
1437 Davis, John W., Joseph, Joseph W. An Archeological Survey of the next Generation Weather Radar (Nexrad) and National Weather Service (NWS) Office Properties, Peachtree City, Fayette County, Georgia

This report presents the findings of an archeological survey of a 0.589 acre Next Generation Weather Radar (NEXRAD) tower location, a 1.68 acre access road for this tower, a 0.083 acre communications easement for this tower, and a 1.8 acre National Weather Service (NWS) office property, all of wh

Fayette 1991
1458 Valk, Diana, Joseph, Joseph W. Phase1 Archaeological Survey of the Leesburg Bypass

New South Associates conducted a Phase I Cultural Resources Survey of the proposed Leesburg Bypass in Lee County, Georgia (GDOT Project STP-0001-00(420), PI #0001420).

Lee 2008
1468 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey of the I-285/paces Ferry Interchange Cobb County, Georgia

On September 13, 1995, New South Associates conducted a Phase I archaeological survey of the proposed improvements to the I-285/Paces Ferry Interchange.

Cobb 1995
1498 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey of Sugarloaf Parkway Extension Gwinnett County, Georgia

New South Associates conducted a Phase I archaeological survey of the proposed Sugarloaf Parkway Extension on December 7, 1994. The project corridor is approximately 1.124 miles in length and consists of approximately 3,400 feet of new alignment and 2,000 feet of road widening.

Gwinnett 1996
1505 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey of the Proposed Improvements to Houston Road, Bibb County

New South Associates conducted a Phase I Archaeological Survey of the proposed improvements to Houston Road, Bibb County, Georgia. The survey of the approximately 3.20 mile corridor was conducted on January 4 and 5, 1996.

Bibb 1996
1507 Joseph, Joseph W. And They Went down Both into the Water, Archaeological Data Recovery of the Riverfront Augusta Site (9Ri165)

Archeological data recovery excavation and analysis for the proposed Riverfront Augusta Convention Center and Office Park development was conducted by New South Associates between the months of September, 1989 and October, 1991.

Richmond 1991
Displaying 21 - 30 of 297