1697
|
Joseph, Joseph W., Hamby, Theresa M.
|
Phase I Archaeological Survey for the Proposed West Cobb Loop Alternate D Realignment, Cobb County, Georgia
|
On October 2 and 3, 1997 New South Associates conducted a Phase I Archaeological survey of the proposed West Cobb Loop, specifically Alternate D, in Cobb County, Georgia. New South Associates previously conducted a survey of is of Alternate D in 1993 (Wheaton et al.
|
Cobb
|
1997
|
1698
|
Joseph, Joseph W., Loubser, Johannes H. N.
|
Archaeological Survey of the Proposed Toccoa Bypass Extension, Stephens County, Georgia
|
Between 23 June and 1 July, 1997, two archaeologists from New South Associates, Inc. conducted a 5.7 mile (9.17 km) long archaeological survey along a proposed bypass in Stephens County, northeastern Georgia.
|
Stephens
|
1997
|
1699
|
Rhodes, Cynthia Gass, Joseph, Joseph W.
|
Phase I Archaeological Survey for the Dallas Road Bridge Replacement Over Noses Creek, Cobb, County, Georgia
|
On August 12, 1997 New South Associates conducted a Phase I archaeological survey of the proposed bridge replacement over Noses Creek, Cobb County, Georgia. This report provides a prehistoric and historic background for the area and completely chronicles the results of the archaeological survey.
|
Cobb
|
1997
|
1700
|
Joseph, Joseph W., Loubser, Johannes H. N.
|
Archaeological Survey and Testing of US 25/SR 121 from Millen To Waynesboro and Phase II Testing of Site, Jenkins and Burke Counties
|
Between March 11 and 27, 1996, New South Associates conducted a archaeological survey and testing along two proposed highway widening corridors in east-central Georgia.
|
Burke
|
1997
|
1701
|
Rhodes, Cynthia Gass, Joseph, Joseph W.
|
Phase I Archaeological Survey for Old Buford Road, The City of Cumming, Forsyth County, Georgia
|
On September 4, 1997 New South Associates conducted a Phase I archaeological survey for the widening and improvements to Old Buford Road, in the City of Cumming, Forsyth County, Georgia.
|
Forsyth
|
1997
|
1702
|
Rhodes, Cynthia Gass, Joseph, Joseph W.
|
Phase I Archaeological Survey for Castleberry Road, The City of Cumming, Forsyth County, Georgia
|
On September 2 - 3, 1997 New South Associates conducted a Phase I archaeological survey for the widening and improvements to Castleberry Road, in the City of Cumming, Forsyth County, Georgia.
|
Forsyth
|
1997
|
1825
|
Joseph, Joseph W., Raymer, Leslie E.
|
Prehistoric and Historic Excavations at Site 9GW347, Gwinnett County, Georgia
|
This report represents the results of historic documentation and archaeological data recovery excavations at Site 9Gw347, the Annistown Mills Site, located on the Yellow River in Gwinnett County.
|
Gwinnett
|
1998
|
1862
|
Gass, Cynthia, Joseph, Joseph W.
|
Phase I Archaeological Survey of Seven Intersection Improvements, Fulton County, Georgia
|
New South Associates conducted a Phase I archaeological survey of seven posed intersection improvements in Fulton County on September 24, 1998.
|
Fulton
|
1998
|
1873
|
Joseph, Joseph W.
|
Phase 1 Archaeological Survey of the Proposed Octagon Road
|
On September 18 and 22, 1998, New South Associates conducted a Phase I archaeological survey of the proposed Octagon Road Corridor in Henry County, Georgia. The study corridor consists of approximately 2.9 km (1.8 miles) on new location with a 91 meter (300 feet) width.
|
Henry
|
1999
|
1893
|
Joseph, Joseph W., Watts-Edwards, Matthew J., Hamby, Theresa M.
|
Phase I Archaeological Survey of the Proposed Sewer Line Along I-75, Monroe and Bibb Counties, Georgia
|
New South Associates conducted a Phase I Archaeological Survey of the proposed sewer/water line along Interstate 75 in Monroe and Bibb Counties, Georgia. The survey of the approximately 9.7 mile corridor was conducted between June 7 and 9, 1999.
|
Bibb
|
1999
|