Back to top

Joseph, Joseph W.

Report Number Author(s) Title Abstract Summary County Year
1697 Joseph, Joseph W., Hamby, Theresa M. Phase I Archaeological Survey for the Proposed West Cobb Loop Alternate D Realignment, Cobb County, Georgia

On October 2 and 3, 1997 New South Associates conducted a Phase I Archaeological survey of the proposed West Cobb Loop, specifically Alternate D, in Cobb County, Georgia. New South Associates previously conducted a survey of is of Alternate D in 1993 (Wheaton et al.

Cobb 1997
1698 Joseph, Joseph W., Loubser, Johannes H. N. Archaeological Survey of the Proposed Toccoa Bypass Extension, Stephens County, Georgia

Between 23 June and 1 July, 1997, two archaeologists from New South Associates, Inc. conducted a 5.7 mile (9.17 km) long archaeological survey along a proposed bypass in Stephens County, northeastern Georgia.

Stephens 1997
1699 Rhodes, Cynthia Gass, Joseph, Joseph W. Phase I Archaeological Survey for the Dallas Road Bridge Replacement Over Noses Creek, Cobb, County, Georgia

On August 12, 1997 New South Associates conducted a Phase I archaeological survey of the proposed bridge replacement over Noses Creek, Cobb County, Georgia. This report provides a prehistoric and historic background for the area and completely chronicles the results of the archaeological survey.

Cobb 1997
1700 Joseph, Joseph W., Loubser, Johannes H. N. Archaeological Survey and Testing of US 25/SR 121 from Millen To Waynesboro and Phase II Testing of Site, Jenkins and Burke Counties

Between March 11 and 27, 1996, New South Associates conducted a archaeological survey and testing along two proposed highway widening corridors in east-central Georgia.

Burke 1997
1701 Rhodes, Cynthia Gass, Joseph, Joseph W. Phase I Archaeological Survey for Old Buford Road, The City of Cumming, Forsyth County, Georgia

On September 4, 1997 New South Associates conducted a Phase I archaeological survey for the widening and improvements to Old Buford Road, in the City of Cumming, Forsyth County, Georgia.

Forsyth 1997
1702 Rhodes, Cynthia Gass, Joseph, Joseph W. Phase I Archaeological Survey for Castleberry Road, The City of Cumming, Forsyth County, Georgia

On September 2 - 3, 1997 New South Associates conducted a Phase I archaeological survey for the widening and improvements to Castleberry Road, in the City of Cumming, Forsyth County, Georgia.

Forsyth 1997
1825 Joseph, Joseph W., Raymer, Leslie E. Prehistoric and Historic Excavations at Site 9GW347, Gwinnett County, Georgia

This report represents the results of historic documentation and archaeological data recovery excavations at Site 9Gw347, the Annistown Mills Site, located on the Yellow River in Gwinnett County.

Gwinnett 1998
1862 Gass, Cynthia, Joseph, Joseph W. Phase I Archaeological Survey of Seven Intersection Improvements, Fulton County, Georgia

New South Associates conducted a Phase I archaeological survey of seven posed intersection improvements in Fulton County on September 24, 1998.

Fulton 1998
1873 Joseph, Joseph W. Phase 1 Archaeological Survey of the Proposed Octagon Road

On September 18 and 22, 1998, New South Associates conducted a Phase I archaeological survey of the proposed Octagon Road Corridor in Henry County, Georgia. The study corridor consists of approximately 2.9 km (1.8 miles) on new location with a 91 meter (300 feet) width.

Henry 1999
1893 Joseph, Joseph W., Watts-Edwards, Matthew J., Hamby, Theresa M. Phase I Archaeological Survey of the Proposed Sewer Line Along I-75, Monroe and Bibb Counties, Georgia

New South Associates conducted a Phase I Archaeological Survey of the proposed sewer/water line along Interstate 75 in Monroe and Bibb Counties, Georgia. The survey of the approximately 9.7 mile corridor was conducted between June 7 and 9, 1999.

Bibb 1999
Displaying 41 - 50 of 297