705
|
Garrow, Patrick H.
|
Cultural Resource Management Vogtle-Effingham-Thalmann Transmission Line Burke, Screven, Effingham, Chatham, Bryan, Liberty, Long, McIntosh, and Glynn Counties, Georgia Resource Inventory II: Final Report
|
This report documents the results of a Resource Inventory II investigation of approximately 153 miles of the proposed Plant Vogtle to Thalmann Substation Electric Transmission Line Corridor.
|
Bryan
|
1984
|
711
|
Bauer, Bruce, Garrow, Patrick H.
|
CRM: Vogtle to Goshen Transmission Line
|
This report documents the results of a Resource Inventory II investigation of the 17.03 mile Vogtle - Goshen Electric Transmission Line Corridor.
|
Burke
|
1984
|
730
|
Garrow, Patrick H., Symes, Steven A.
|
The Big Lazer Creek Unmarked Cemetery: A Multidisciplinary Investigation
|
This project focused on the excavation and analysis of six historic period graves discovered during construction within the Big Baker Creek Wildlife Management Area in Talbot County, Georgia.
|
Talbot
|
1987
|
737
|
Garrow, Barbara A., Garrow, Patrick H.
|
Cultural Resource Management Vogtle-plant Scherer Transmission Line, Wadley - Wallace Dam Section Jefferson, Washington, Hancock, and Putnam Counties Resource Inventory II: Final Report
|
This report documents the results of a Resource Inventory II investigation of the 56.4 mile Wadley - Wallace Dam Section of the Plant Vogtle to Plant Scherer Electric Transmission Line Corridor.
|
Jefferson
|
1984
|
741
|
Garrow, Patrick H., Bryne, Stephen C.
|
Management Summary: Archaeological Testing at the Bertha Petty Site, Atlanta Gas Light Proposed Pipeline Corridor, Murray County, Georgia
|
Archaeological testing of the Bertha Petty Site (Survey Site 1) was carried out from May 11 through May 26,1987 by Garrow and Associates, Inc.
|
Murray
|
1987
|
787
|
Garrow, Patrick H.
|
A Cultural Resource Survey of Proposed Pine Hill Loop 115kv Transmission Line, Decatur County
|
This report documents the result of a cultural resource survey of the proposed Pine Hill Loop Transmission Line corridor, Decatur County, Georgia. The total length of the investigated corridor is approximately 1.83 miles, and the right-of-way varies from 75 to 100 feet wide.
|
Decatur
|
1988
|
789
|
Garrow, Patrick H.
|
Investigations of a Section of Rerouted Transmission Line Corridor and New Groover Lake Substation Site, Douglas County
|
This report documents the results of the investigation of 688 meters (2,100 feet) of rerouted transmission line corridor and a new 6.3 acre substation site planned for construction by Oglethorpe Power Corporation in Douglas County, Georgia.
|
Douglas
|
1988
|
828
|
Bloom, Jonathan A., Garrow, Patrick H.
|
Cultural Resources Survey of Two Proposed Lake and Borrow Areas for the Georgia Northern Industrial Park, Bartow County, Georgia
|
This report documents the results of the cultural resources survey of a proposed 30 acre lake and associated borrow areas, and a six acre lake, for the Georgia North Industrial Park, Bartow County, Georgia, for Bartow Engineering & Development Consultants.
|
Bartow
|
1989
|
853
|
Childress, Mitchell R., Garrow, Patrick H.
|
Archaeological Survey of the Council Fire Development Tract, Hamilton County, Tennessee and Catoosa County, Georgia
|
The Council Fire project involved archaeological survey of a 500+ acre tract in Catoosa County, Georgia and Hamilton County, Tennessee, that is planned for development as a residential community and golf course.
|
Catoosa
|
1990
|
890
|
Garrow, Patrick H.
|
A Cultural Resource Survey of the Proposed Russell Parkway 115 Kv Transmission Line, Houston County, Georgia
|
This report documents the result of a cultural resource survey of the proposed Russell Parkway 115 kV Transmission Line corridor, Houston County, Georgia. The study corridor consisted a 625 foot long by 75 foot wide segment that crossed Bay Gall Creek on the southern fringes of Warner Robins.
|
Houston
|
1988
|