1055 Bowen, William R. An Intensive Archaeological Survey of Georgia Dot Project M-7050(1)

Georgia Department of Transportation Project #M-70S0 (1), Richmond County is the extension of Murray Road from a point just east of the Richmond-Columbia County line to a point near the intersection of Broad and 1Sth streets (Figure 1).

Richmond 1984
1397 Bowen, William R. Archaeological Testing at 9HL20

On August 27, 28, and 29, 1986 the Georgia Department of Transportation conducted archaeological test excavations at site 9HL20 in Hall County, Georgia.

Hall 1986
1426 Bowen, William R. An Archaeological Survey of Rae's Creek Drainage Improvements Project (Berckmans Rd. To Boy Scout Rd.)

An intensive archaeological survey of the proposed drainage improvements to Rae's Creek failed to identify any archaeological resources within the area of potential environmental effects (construction limits and easements).

Richmond 1992
1974 Carnes, Linda F., Bowen, William R. Archaeological Impact Studies Marta East and West Lines

A large construction project, such as the building of a mass rapid transit system, is highly destructive to the cultural remains that may lie in its path.

DeKalb 1977
2582 Lotti, Teresa Ann, Bowen, William R. Archaeological Reassessment of Project STP-104-1(39), Forsyth County

None Present.

Forsyth 2004
4613 Bowen, William R. Archaeological Assessment of Project FR-038-1 (23), Appling County

This is the widening of S.R. 4 from just south of the U.S. 1/U.S. 341 intersection (Park Avenue) in Baxley to just north of Sambo Street, a distance of 1.14 miles. A 100 foot corridor center about the existing centerline was surveyed for the project length.

Appling 1985
4712 Bowen, William R. Archaeological Assessment of Project F-003-2(45-49), Gwinnett-Barrow-Oconee Counties

This project would construct a 4-lane divided roadway on a minimum of 300 feet right-of-way from the present S.R. 316 terminus northeast of Lawrenceville to U.S. 78/S.R. 10 south of Bogart, a length of approximately 25 miles. A survey consistent with the project corridor was conducted.

Gwinnett 1986
4713 Bowen, William R. Archaeological Assessment of Project-RS-0828(6), Bartow County-Reevaluation

This reevaluation is the relocation of U.S. 411/S.R. 61 at S.R. 140 at Rydal. The project is approximately 0.7 mile long and a corridor 50 feet either side of the proposed centerline was surveyed.

Bartow 1985
4714 Bowen, William R. Archaeological Assessment of Project BRZLB-15(6), Bartow County

This is a bridge replacement on new location on C.R. 316 over Oothcalooga Creek. The project is approximately 1,200 feet long with a required right-of-way of 100 feet. An archaeological survey consistent with the project limits was performed.

Bartow 1986
4715 Bowen, William R. Archaeological Assessment of Project IR-75-3(156-161), Bartow, Gordon, Whitfield, and Catoosa Counties.

This is the within-median addition of a northbound and southbound travel lane on 1-75 from U.S. 411 to the Tennessee State line. A corridor from U.S. 411 to the Tennessee State line and within the existing right-of-way was surveyed.

Bartow 1985