Back to top

Bowen, William R.

Report Number Author(s) Title Abstract Summary County Year
6303 Bowen, William R. Archaeology Assesssment of Project IR-285-1(280), Cobb/ Fulton and IR-285-1(286), DeKalb County

This project would widen 1-285 from 1-75 to 1-85, a. distance of 13.2 miles. A survey consistent with the project corridor was conducted.

Murray 1980
6307 Bowen, William R. Archaeology Assessment of Project PEMR-9016(3), Cobb/Fulton Counties

This project proposes to convert to one-way pairs Akers Mill/Powers Ferry Roads from just west of Rottenwood Creek to Northside Drive and North Parkway from just west of Rottenwood Creek to Northside Drive.

Murray 1979
6309 Bowen, William R. Archaeological Assessment of Project IR-75-3(165), Cobb County

This is the proposed widening of the south-bound 1-75 Exit Ramp at Windy Hill Road and the attendant lane addition to the mainline.

Gilmer 1985
6310 Bowen, William R. Archaeological Assessment of Project IR-75-3(164) and FR-114-1(63) Loop, Cobb County

This is the proposed widening of S.R. 120 Loop/South Marietta Parkway from 1-75 to Roswell Road and the reconstruction of the I-75/South Marietta Loop interchange. A corridor consistant with the proposed project rights-of-way was surveyed for the entire length of the project.

Gilmer 1984
6315 Bowen, William R. Archaeological Assessment of Project M-9025(8), Cobb County

This is the widening of S.R. 3 (Atlanta Road) from 2/3 to 5 lanes from Spring Road to Hawthorne Road, a distance of 1.0 mile.

Morgan 1978
6324 Bowen, William R. Archaeological Assessment of Project F-178-1(21), Cobb/Paulding Counties. (Reevaluation)

A corridor consistent with the proposed rights-of-way were surveyed for the entire length of the project.

Wilcox 1993
6325 Bowen, William R. Archaeological Assessment of Project F-178-1(21), Cobb/Paulding Counties

This project involves the widening and reconstruction of U.S. 278/S.R. 6 from the proposed terminus of the Dallas Bypass (at C.R. 19 about 1 mile west of S.R.

Dodge 1985
6416 Bowen, William R. Archaeology Assessment of Project FR-078-1(12), ct2, Gwinnett County

This project proposes the extension of S.R. 124/Scenic Highway from Henry Glower Blvd. to Lenora Church Road, a distance of 0.28 miles.

Crisp 1996
6419 Bowen, William R. Archaeology Assessment of Project FR-061-1(89), Dekalb and Gwinnett Counties

This project proposes to widen S.R.10/U.S.78 from Stone Mountain Park Interchange to East Park Place Boulevard. The existing right-of-way is approximately 230 feet and the required right-of-way is variable up to approximately 600 feet at the proposed interchange.

Tift 2006
6439 Rotenstein, David S., Bowen, William R. An Intensive Archaeological Survey of GDOT Project F-012-1(56), Floyd County East Rome Connector

An archaeological survey was performed by GDOT for project F-012-1(56), Floyd County. One site of potential National Register of Historic Places significance was identified.

Glynn 1991
Displaying 51 - 60 of 334