Bowen, William R.

Report Number Author(s) Title Abstract Summary County Year
7274 Bowen, William R. Archaeological Assessment of Project IR-75-2 (155), Henry/Clayton Counties

This is the proposed within-median widening of Interstate 75 from I-675 northward to S.R. 7/U.S. 41. The total length of the project is 7.8 miles.

Worth 1978
7328 Bowen, William R. Archaeological Assessment of Project FR-001-6 (26), Gordon County

This is the widening of U.S.41/S.R. 3 from Chandler Street to N. Dalton By-Pass/C.R. 379. A corridor 50 feet either side of the existing centerline was examined between these two points.

Bryan 2013
7329 Bowen, William R. Archaeological Assessment of Project FR-065-2 (9), Gordon County

This is the widening of S.R. 53 Spur from S.R. 136 to just south of Oothkalooga Creek. A corridor 1.5 miles long and 100 feet either side of the existing centerline was examined.

Lowndes 1995
7342 Bowen, William R. Archaeological Assessment of Project F-174-1 (3)

This is the widening of S.R. 232 from approximately 600 feet west of Bel Air Road (S-2120) to a point approximately 2000 feet west of S.R. 104/S.R. 232 intersection. A corridor 2.2 miles long and 100 feet either side of the existing centerline was surveyed.

Long 2012
7343 Bowen, William R. Archaeological Assessment of Projects FR-043-1 (43) and BHF-043-1 (44)

This project would widen S.R. 41/U.S. 1 to 4 lanes from the existing 3-lane section south of Spirit Creek to the existing 4-lane section at Tobacco Road. The project is approximately two miles long. A survey consistent with this corridor was conducted.

Lowndes 2013
7348 Bowen, William R. Archaeological Assessment of Projects MR-7024 (1 & 2) and IR-20-2(108). Columbia/Richmond Counties

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, projects MR-7024(1 & 2) and IR-20-2(108), Columbia/Richmond Counties has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the Natio

Bartow 2012
7350 Bowen, William R. Archaeological Assessment of Projects MR-7024(2), Richmond/ Columbia Counties, MR-7024(1) and IR-20-2(108), Columbia County

This project would widen and extend Belair Road from S.R. 104/Washington Road in Columbia County to S.R. 10/Gordon Highway in Richmond County. The project would be approximately seven mile long on a proposed right-of-way of 84 to 200 feet. A survey consistent with this corridor was performed.

Barrow 2012
7594 Bowen, William R. Archaeological Assessment of Project FR-065-2(8), Gordon County

In compliance with Section ·l06 of the National Historic Preservation Act of 1966 and amendments thereto, project FR-065-2(8), Gordon County has been surveyed with respect to archaeological resources, espec1ally those on or eligible for inclusion in the National Register of Historic Places (NRHP

Henry 2002
8432 Bowen, William R. An Intensive Archaeological Survey of Georgia Department of Transportation Project #APD-056-2(7): the Appalachian Development Highway Mainline From Ellijay to Blue Ridge, Gilmer and Fannin Counties, Georgia

Over the past five years (Spring 1976 - Spring 1981) archaeological investigations were conducted intermittently on Georgia Department of Transportation Project #APD-056-2(7): the Ellijay to Blue Ridge Mainline in Gilmer/Fannin Counties, Georgia.

Gordon 2014
8463 Bowen, William R. Archaeological Assessment of Project F-074-1(35) and M-8059(1), Muscogee County

This project proposes to relocate Miller Road from Milgen Road to Moon Road in Columbus. A corridor 1.5 miles long and 150 feet wide was surveyed f or the entire project.

Douglas 2014
Displaying 71 - 80 of 334