CSSTP-M003-00(360), P.I. M003360 Clayton County Resurfacing Project

Author(s)
Report Number
10736
Year of Publication
2005
Abstract

This proposed project consists of the leveling, resurfacing, and shoulder building of SR 3 Connector beginning at the entrance to the Arrowhead Shopping Center and ending at the I-75 entrance and exit ramps. All work will take place within the existing right-of-way with no new right-of-way required. Total project length is approximately 1.76 miles.