Back to top

CSSTP-M003-00(359), P.I. M003359 Clayton County Resurfacing Project

Author(s)
Report Number
10741
Year of Publication
2005
County
Abstract

This proposed project consists of the leveling, resurfacing, and 2' shoulder paving and 4' shoulder building of SR 85 beginning at its intersection with SR 331 and ending 120' south of the bridge from the I-75 ramp. All work will take place within the existing right-of-way with no new right-of-way required. Total project length is approximately 0.61 mile.