Back to top

Archaeological Assessment of a Cobb/Dekalb/Fulton County GDOT NaviGAtor System Upgrade Project

Author(s)
Report Number
11056
Year of Publication
2006
County
Abstract

Archeological Assessment of a Cobb/DeKalb/Fulton County GDOT NaviGAtor System Upgrade project. The proposed project consists of installing ramp meters, Vehicle Detection Systems (VDS) cameras, and Closed Circuit Television (CCTV) cameras at the east and westbound entrance ramps onto I-285 beginning at I-75 north and ending at I-85 north. All work will take place within the existing right-of-way with nonew right-of-way required. Total project length is approximately 13.17 miles.