F-055-1(26), Banks County

Report Number
11204
Year of Publication
1980
County
Abstract

THE PROJECT BEGINS ON US 441/SR 15 AT THE RAMP TERMINALS ON THE SOUTHSIDE OF THE I-85 INTERCHANGE WHERE THE PROJECT BHF 055 -1 (25) NOW ENDS AND EXTENDS APPROXIMATELY 0.4 MILE NORTHERLY ALONG US 441 / SR 15 TO A POINT JUST BEYOND THE DEVELOP ED AREA NORTH OF THE I-85 INTERCHANGE. THE PROJECT INCLUDES THE WIDENING OF THE EXISTING TWO LANE ROADWAY AND BRIDGE OVER I-85 TO A FOUR LANE FACILITY WITH CURB AND GUTTER AND A 14' FLUSH MEDIAN. THE PROJECT WILL BE CONSTRUCTED WITHIN THE EXISTING RIGHTS-OF-WAY WHICH RANGE FROM 100' TO 140' IN WIDTH.