Back to top

Archaeological Assessment of BHM-9106(1), Clayton County

Report Number
11226
Year of Publication
1985
County
Abstract

Existing bridge is 22.5’ X 50’ with a concrete substructure, 3 span steel beams and a concrete deck, existing right of way 80 ft. New structure will be 44’ X 50’ single span with approaches beginning 700’ west of the bridge and ending 800 ft east of the bridge. Alignment will shift 10.98 to the north, requiring 12 feet of additional right of way. No detour required.