Abstract

The existing structure is a 63ft. long railroad bridge over S.R. 29, one double 5ft. x 5ft. box culvert, 'one triple 9ft. x 6ft. bridge culvert. Existing R/W is 200 ft. e. Termini, description of new structure, required ROW, location of realignment or detour. This project begins approx. 1050 ft. northwest of the bridge and ends approx 1056 ft. southeast of the bridge. The new structure will be a 237 ft. concrete railroad bridge.

The existing culverts will be extended to meet clear zone requirements. No additional R/W will be required. However, temporary easement will be required during construction. There will be an offsite detour during construction.