Archaeological Assessment of Project BRS-0722(13), Screven County

Report Number
11413
Year of Publication
1993
County
Abstract

105' x 23.7' concrete and steel bridge with wood piles. Existing right-of-way is 100 feet. Replacement structure would be a triple 9' x 8' x 56' concrete bridge culvert. total required right-of- way would vary from 100 feet to 160 feet. The project would begin approximately 700 feet east of the stream and end approximately 500 feet west of the stream. The approaches would be two 12' lanes with 8' shoulders. A temporary easement on the downstream side would be required for an on-site detour. A temporary easement on the upstream side would be required for a rerouting of the existing stream to flow consistently with the 100-year floodplain.