Back to top

Archaeological Assessment of Project BHF-034-2(20), Berrien County

Report Number
11431
Year of Publication
1985
Abstract

Prepared 800’ x 40’ concrete bridge; the existing structure will be widened 8’ on each side. No additional right of way will be needed. Traffic will be maintained during construction.