Archaeological Assessment of Project BHF-186-1(13), Paulding County

Author(s)
Report Number
11447
Year of Publication
1987
Abstract

Lick Log Creek: Begin 315’ south of bridge; end 315’ north of bridge. Widen existing bridge to 44’. No right of way required. Grays Mill Creek: Begin 550’ south of bridge; end 315’ north of bridge. Widen existing bridge to 62.8;’ 35’ x 2’ strip of right of way required. Southern Railway: Begin 650’ south of bridge; end 600’ north of bridge. Widen existing bridge to 44;’ 10’-35’ right of way required. Seaboard Coast Line RR: Begin 360’ south of bridge; end 330’ north of bridge. Widen existing bridge to 68.’ 40’ right of way required.