Abstract

Existing structure is a 130 ft. x 23.8 ft. concrete T-beam bridge existing R/W is 200 ft. Termini, description of new structure, required ROW, location of realignment or detour. The project begins approx. 200ft. south of the creek and ends approx. 200 ft. north of the creek. The new structure will be a double 9ft. x 8ft. bridge culvert. No additional R/W will be required Stage construction will be used to maintain traffic during construction.