Back to top

Archaeological Assessment of Project BRF-036-2(8), Pierce/Brantley Counties

Author(s)
Report Number
11480
Year of Publication
1989
Abstract

24'x80', 24'x80', and 23.9'xl470' respectively; 80 feet existing right-of-way; Replace bridges at each site with a triple 10'x8'x54' culvert, a triple 10'x6'x54' culvert and a 38'x1470' bridge; Widen approaches from 0.1 mile prior to 0.1 mile past bridge at both creeks and from 0.15 mile prior to 0.15 mile past at the river. No required right-of-way, easement required on the north side of the roadway at each site for detour.