Back to top

Archaeological Assessment of Project BHF-041-1(10), Burke County

Author(s)
Report Number
11488
Year of Publication
1988
Abstract

Project begins 500 ft. west of stream. New structure will be a triple 9' x8' concrete bridge culvert. A temporary detour easement will be required. (see attachment) Detour will be constructed on downstream side (see attachment). 23.7 ft. x 80ft. timber, steel and concrete bridge. Existing right of way is 200 ft. total.