Back to top

Project IM-16-1(129) Statewide County, Determination of No Undertaking

Report Number
12090
Year of Publication
1999
Abstract

Project IM- 16-1(129), Statewide County: Determination of No Undertaking The subject project would consist of the repairing of 15 interstate bridges throughout the state. Repairs would include epoxy injection into cracks, patching concrete, and/or fiber reinforced polymer additions. The proposed project would consist of the bridges at the following locations:

County                                         Location

Dekalb                                   I-285 NB over South River

Bibb                                       I-75 NB over water main

Bibb                                       I-16 WB over Ocmulgee River overflow

Bibb                                       I-16 WB over Ocmulgee River overflow

Bibb                                       I-16 WB over SR 87

Twiggs                                   I-16 WB over Flat Creek

Laurens                                  I-16 WB over Oconee River overflow

Laurens                                  I-16 WB over Oconee River overflow

Laurens                                  I-16 WB over Sandy Drain Branch

Laurens                                  I-16 Pughes Creek Tributary

Laurens                                  I-16 WB over Mercer Creek

Bulloch                                  I-16 WB over Luke Swamp Creek

Bryan                                     I-16 WB over Ogeechee River overflow

Bryan                                     I- 16 WB over Ogeechee River

Effingham                             I-16 WB over Ogeechee River overflow

No earthwork would be involved in the repair of these bridges. No acquisition of additional right-of-way or construction would be required to implement the project.