Back to top

Phase 1 Archaeological Survey of Proposed Resurfacing along State Route 27 in Glynn County, Georgia

Author(s)
Report Number
12462
Year of Publication
2018
County
Abstract

The proposed work will take place along a 6.893 mile section of State Route (SR) 27 in Glynn County from the south end of the Yellow Bluff Creek Bridge to the intersection of SR 25 (MP 16.177 – MP 23.070) (Figure 1). The proposed work consists of milling, patching, resurfacing, striping, raised pavement markers with four foot earth shoulder building, and curb cuts to install wheel chair ramps. The project will take place within existing Right-of-Way (ROW), which varies throughout. The limits of construction will be 5 feet from the edge of pavement. Work on all bridges with concrete decks will be limited to restriping only.