Back to top

Archaeological Assessment of Project BRF-030-4(15), Tattnall County

Author(s)
Report Number
12558
Year of Publication
1990
Abstract

Replace existing alignment with an approximately 44’x1200’ concrete bridge; reconstruct approaches from approximately 1100 feet before to approximately 1100 past the existing bridge; No additional R/W or easement required; road to be closed during construction with traffic detoured to area roadways.