The proposed project would replace the existing SR 15/SR 10 Loop EB and WB at SR 8/US 29 twin bridges with two 12-foot lanes per bridge. Additionally, an 8-foot outside shoulder and a 4-foot inside shoulder would be constructed. The replacement bridges will be raised approximately 3 feet to meet the minimum vertical clearance under the bridge and to accommodate concrete beams. The proposed roadway would be full depth asphaltic concrete, and the roadway outside shoulders will be widened to 12-foot and the inside shoulders will be widening to 8-foot. The amount of required right-of-way (ROW) needed for this project is unknown at this time.