Archaeological Assessment of a Proposed Maintenance Project along State Route 280/S. Cobb Drive in Cobb County, Georgia

Author(s)
Report Number
12707
Year of Publication
2018
County
Abstract

The proposed work consists of milling, patching. resurfacing, striping, as well as the installation of raised pavement markers and curb cuts for Americans with Disabilities Act-compliant sidewalk ramps along a 5.252-mile section of State Route (SR) 280/S. Cobb Drive in Cobb County. Georgia from SR 5/ Austell Road to the Interstate (1-)75 northbound off ramp (Figure I). The project will take place within existing right-of-way (ROW), which varies throughout. The limits of construction will be 5 feet from the existing edge of pavement. Only restriping will occur on bridges with concrete decks.