Back to top

Archaeological Assessment of Project BRS-1873(3), Evans County

Author(s)
Report Number
12722
Year of Publication
1985
County
Abstract

This is the construction of a detour bridge over Bull Creek on SR 129. The existing bridge will be replaced in place and the detour is about 1200 feet long and the center line is located 50’ east of the existing area. Apparently all work will take place within the existing 200’ of R/W north of the bridge. There is 100’ r/w in surrounding are graded or disturbed. Two chert flakes in Road cut NE of bridge.