Back to top

Cultural Resources Survey of the “Wilcox Pineview” Guyed Tower Telecommunication Facility, Pineview, Wilcox County, Georgia

Author(s)
Report Number
12985
Year of Publication
2019
County
Abstract

In May 2019, Trileaf Corporation (Trileaf) performed a cultural resource inventory survey for a proposed guyed tower telecommunication facility located in Wilcox County, Abbeville, Georgia (Latitude: 32° 05' 9.89" Longitude: -83° 23' 7.76"). The project location is located within a wooded area.

Diamond Towers V, LLC proposes the construction of a new guyed cell tower with a total height of 249 feet (75.9 meters). The new tower and associated equipment will be situated within a 100 x 100-foot (30.5 x 30.5 meter} cell tower lease area. A 30 x 240-foot (9.1 x 73.2 meter} access and utility easement will travel southwest linking the lease area to US Highway 129. Additionally, three (3) proposed approximate 15 x 123-foot (4.6-35.0-meter} guy anchors will extend northwest, east-northeast, and southwest from the lease area. Total acreage of the new construction area is approximately 0.44 acres (0.19 Hectares}.

Senior Project Archaeologist Zach Horne, M.A., RPA, under the direction of Trileaf, performed this survey in response to the planned use of the above-described parcel and the potential impacts that such use might represent to archaeological and architectural cultural resources. The Phase I cultural resource survey was designed to discover all prehistoric and historical period cultural resources that might be present within the project area.

The field survey of the project area, which included a pedestrian survey, shovel testing, and visual inspection, found no evidence for the presence of archaeological or architectural properties in relation to the current project area's Direct APE. Additionally, no National Register of Historic Places (NRHP}-eligible or listed properties were identified within the project area's Direct or Visual APE.

Based on these findings, Trileaf recommends No Historic Properties in both the Direct APE and the Visual APE. It is therefore recommended that project clearance be granted with no further investigation or evaluation of the project area relative to those resources.