Back to top

Phase I Archaeological Survey in Advance of Sidewalk Improvements at CS 751/CR 1317/Davis Street and CS 753/Pinecrest Lane, Jackson County, Georgia

Author(s)
Report Number
14476
Year of Publication
2021
County
Abstract

The proposed project would provide sidewalk, curb and gutter, and pedestrian lighting in the Town of Braselton along Davis Street and Pinecrest Lane. On Davis Street between Pinecrest Lane and Keys Drive, the proposed improvements would include new 61-centimeter (cm) (24-inch [in]) curb and gutter, a closed drainage system, a 1.8-meter (m) (6-foot [ft]) sidewalk, and pedestrian lighting on the north side of Davis Street for approximately 655.3 m (2,150 ft). With 10.7 m (35 ft) between the edge of pavement and the existing right-of-way (ROW) extent, no ROW or easements are expected to be required on this segment of Davis Street. On Pinecrest Lane between Davis Street and State Route (SR) 124, the proposed improvements would include new 61 cm (24 in) curb and gutter, a closed drainage system on both sides of the street, and a 1.8 m (6 ft) sidewalk on the west side of Pinecrest Lane, for a total length of 393.2 m (1,290 ft). With 3.7 m (12 ft) between the edge of pavement and the ROW extent, there is enough ROW to accommodate the sidewalk and curb and gutter, however grading, drainage, and driveway tie-ins will likely require easements, the extent of which is unknown at this time.