Back to top

Archeological Survey of project CSSTP-0007-00(120), Fulton County

Author(s)
Report Number
2995
Year of Publication
2005
Abstract

This project proposes to upgrade all traffic signal equipment (signal heads, controllers, ped heads, ramps, loops, etc.) and communication equipment at 33 intersections along SR 140/SR 9/Holcomb Bridge Road/Crossville Road from River Exchange to Steeple Run/Wildwood Road. All work will take place within the existing right-of-way, no new right-of-way will be required. Total project length is 14.5 miles.