Back to top

Archeological Survey of project CSSTP-0007-00(115), Fulton County

Author(s)
Report Number
2997
Year of Publication
2005
Abstract

This project proposes to upgrade all traffic signal equipment (signal heads, controllers, ped heads, ramps, loops, etc.) and communication equipment at 9 intersections along SR 154/Campbellton Road from 1-285 to Suber/Union Road. All work will take place within the existing right-of-way, no new right-of-way will be required. Total project length is 5 miles.