Back to top

Addendum to Phase I Archaeological Survey of Eagle's Landing Parkway from Village Center Parkway to East of Talon Place (East Lake Parkway), Henry County, Georgia

Author(s)
Report Number
3003
Year of Publication
2005
County
Abstract

Original Project Description: this project proposes widening Hudson Bridge Road/Eagles Landing Parkway from Jodeco Road through the intersection with US23/SR42 to Talon Place with an exception from 1200' west of the I-75/SR401 southbound ramps to Village Center Parkway. The existing 2-lane facility will be reconstructed as a 4-lane roadway with a 20' raised median and 16' shoulders that include curb and gutter, a 5' sidewalk on the north and a 10' multiuse trail on the south. Left and right turn lanes and intersection improvements will be included where warranted as well as all applicable pedestrian facilities. The exception, which includes an existing 2-lane bridge over I-75/SR40, will be reconstructed under Project No. NH-IM-75-2(212) which is an interchange project that was let for construction in December 2003. The total length of the proposed project is approximately 3.06 miles (see separate sheet for revised description).