Back to top

Addendum: Archeological Survey and Testing of the Proposed Bridge Replacement at SR 20 over South River, Henry and Newton Counties, Georgia

Author(s)
Report Number
3025
Year of Publication
2004
County
Abstract

The project consists of adding 150 ft of required right-of-way to the west end of the previously delineated and surveyed project area, which was a 836 m (2740 ft) long and spanned the South River. The new right-of-way will be 15 ft wider than existing right-of-way on both sides of SR 20. Project maps show no significant construction in this added 150 ft long area, but the additional right-of-way is needed for shoulder improvements.