Back to top

Archaeological Reassessment of Projects STP-018-1(56) & BRF-018-1(44), Bartow County

Report Number
3064
Year of Publication
2005
Abstract

STP-018-1(56) would widen and reconstruct part of SR 61/SR 113 in Bartow County, Georgia. BRF-0181(44) would replace the bridge over the Etowah River. Both projects have been extensively surveyed by Southeastern Archeological Services, Inc. in 1994. Since that time, the project has been changed to include easements and sediment basins along SR 61/SR 113. The easements and sediment basins are various sizes and are located in different areas along the project corridor. An archaeological survey consistent with the proposed project description was conducted along the entire length of the project corridor.