Addendum to Archaeological Survey of Six Proposed Bridge Replacements on the Coastal Plain of Southeastern Georgia

Report Number
3087
Year of Publication
2004
County
Abstract

Addendum to Archeological Survey of Six Proposed Bridge Replacements on the Coastal Plain of Southeastern Georgia. The proposed project would replace the existing bridge over Buffalo Creek with a new 510-foot long by 44-foot long wide bridge to be constructed on new alignment to the west of the existing structure. SR 23/US 301 would consist of two 12-foot travel lanes with 10-foot shoulders, two feet of which would be paved. The proposed right-of-way (ROW) would vary between 100 and 145 feet. A total of approximately 1.50 acres of additional ROW would be required for the proposed project. Two-way traffic would be maintained on the existing bridge while the proposed bridge is constructed. Once the proposed structure and approaches are complete, the old bridge would be removed.