Back to top

Archaeological Assessment of Project STP-0006-00(491), Baldwin County

Author(s)
Report Number
3238
Year of Publication
2005
Abstract

An Archaeological Assessment of Project STP0006-00(491), Baldwin County. The proposed project would install a traffic signal at the SR 29/US 441/Garrett Way/CR10 intersection in Milledgeville, Georgia. The existing right-of-way for SR 29 varies with a maximum of 200 feet. The existing right-of-way for CR 10 is 80 feet. The required right-of-way for SR 29 is an additional 100 feet, while an additional 80 feet of required right-of-way is needed on CR 10. The total length of the proposed project is 0.14 mile. An archaeological survey consistent with the proposed project description was conducted along the entire length of the project corridor.