Back to top

Phase I Archaeological Survey of the SR 138 Extension, Walton County, Georgia

Report Number
3531
Year of Publication
2006
Abstract

GDOT proposes to extend SR 138 on new location from U.S. 78/SR 10 Bypass to SR 11. The proposed typical section would consist of two 12-foot travel lanes separated by a 14-foot center turn lane on approximately 150 feet of right-of-way (Figure 2). The proposed project is approximately 1.5 miles long.