Back to top

Phase I Archaeological Survey of the SR 138 Extension, Walton County, Georgia

Report Number
3531
Year of Publication
2006
County
Abstract

GDOT proposes to extend SR 138 on new location from U.S. 78/SR 10 Bypass to SR 11. The proposed typical section would consist of two 12-foot travel lanes separated by a 14-foot center turn lane on approximately 150 feet of right-of-way (Figure 2). The proposed project is approximately 1.5 miles long.