Nail Road Improvements Archaeological Investigation

Author(s)
Report Number
4080
Year of Publication
2007
Abstract

The proposed project would pave and upgrade Nail Road to meet 35 mph design speed (Figure 1). Currently, Nail Road is a gravel road and is constructed for speeds below 3 5 mph. The project would include replacing two undersized culverts. The stream crossing at Sta. 51+00, two 48" corrugated metal pipes, would be replaced with three 8'x5' box culverts. The second stream crossing at Sta. 62+50, 54" corrugated metal pipe, would be replaced with two 60" reinforced concrete pipes. The total project length is 6000 ft (1.14 miles).