Phase I Archaeological Survey of the Powder Springs Road Multi-use Path Project Area

Report Number
4539
Year of Publication
2009
Abstract

This project length consists of approximately 9,600 linear feet of multiuse concrete path on the east side of Powder Springs Road, starting at mile post 8.6 on SR 360 and ending at approximately mile post 10.34 on SR 360. This path will be 10 foot wide with a 4 foot grass strip. The path will be constructed within the existing and proposed ROW. The city will maintain the proposed path and grassing (sod). In the areas where there is rural shoulder, approximately 3,600 ft of curb and gutter will be installed along with the required storm drainage.