Back to top

Archaeological Assessment of Project FR-004-2(24) Baldwin/Jones Counties

Author(s)
Report Number
4674
Year of Publication
1988
County
Abstract

The proposed project would add two eastbound passing lanes and one westbound passing lane to S.R. 22 between Gray in Jones County and a point just west of Milledgeville in Baldwin County. An additional 10 feet of right-of-way would be required. Passing Lane No. 1 (eastbound) would begin at M.P. 4.3 and end at M.P. 5.8 in Jones County, a distance of 1.5 miles. Passing Lane No. 2 (eastbound) would begin at M.P. 8.6 in Jones County and end at M.P. 1.65 in Baldwin County, a distance of 1.75 miles. Passing Lane No. 3 (westbound) would begin at M.P. 2.12 and end at M.P. 3.87 in Baldwin County, a distance of 1.73 miles. A survey consistent with the proposed rights-of-way was surveyed for the entire length of the project corridor. No significant archaeological resources were located within the proposed project corridor as described in paragraph two above.