Back to top

Assessment of Project TSAP-140(58), Bartow County

Report Number
4706
Year of Publication
1993
County
Abstract

The proposed project would construct an access driveway to property in the northeast quadrant of the SR 140 and 1-75 intersection. Approximately 60 feet of right-of-way would be required. An archaeological survey consistent with the project description was conducted for the entire length of the project corridor.