Back to top

Archaeological Assessment of Project F-003-2(45-49), Gwinnett-Barrow-Oconee Counties

Author(s)
Report Number
4712
Year of Publication
1986
Abstract

This project would construct a 4-lane divided roadway on a minimum of 300 feet right-of-way from the present S.R. 316 terminus northeast of Lawrenceville to U.S. 78/S.R. 10 south of Bogart, a length of approximately 25 miles. A survey consistent with the project corridor was conducted.