Back to top

Archaeological Assessment of Project FR-005-5(16), Chatham County

Report Number
5120
Year of Publication
1981
County
Abstract

The project is the proposed widening of S.R. 26/U.S. 80 from 1-95 in Pooler to the bridge over the Central of Georgia Railroad in Garden City. The project would widen the existing facility within a 100 to 200 foot right-of-way for 5.4 miles. An archaeological survey was conducted within the corridor for the entire length of the project. An archaeological survey (Level I) was conducted within the project corridors in accordance with "GDOT Archaeological Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No significant archaeological resources were located within the proposed project corridor as described in paragraph two above. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.