Back to top

Archaeological Assessment of Project FR-056-1 (45), Fulton County

Report Number
5755
Year of Publication
2010
Abstract

This project proposes the extension of Mansell Road from Old Roswell Road to Old Alabama Road. A Corridor 200 feet wide was surveyed for 3.5 miles. Also, the project requires that exit ramps be constructed at the proposed interchange with Ga. 400. An archaeological survey (Level III) was conducted within the project corridors in accordance with "GDOT Archaeological Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No significant archaeological resources were located within the proposed project corridor as described in paragraph two above. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above".