Back to top

Archaeological Assessment of Revised Project FR-088-1(31), Glynn County

Report Number
6260
Year of Publication
1978
County
Abstract

The proposed project consists of the widening and reconstruction of US 341/SR 27. This 0.87 mile project begins at Crispen Boulevard and ends approximately 500 feet beyond Glynndale Drive in Brunswick. The existing right-of-way is 100 feet; the required right-of-way would be 120 feet. An archaeological survey consistent with the project corridor was conducted. The archaeological survey (Level II) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred with by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No archaeological resources were located within the proposed corridor as described in paragraph two above. It is concluded, therefore, that the project will not affect archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.