Back to top

Archaeology Assesssment of Project IR-285-1(280), Cobb/ Fulton and IR-285-1(286), DeKalb County

Author(s)
Report Number
6303
Year of Publication
1980
Abstract

This project would widen 1-285 from 1-75 to 1-85, a. distance of 13.2 miles. A survey consistent with the project corridor was conducted. An archaeological survey (Level I) was conducted in accordance with "GDOT Archaeological Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No significant archaeological resources were located within the proposed project corridor as described in paragraph two above. It is concluded, therefore, that the project would have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.