Back to top

Archaeological Assessment of Project FR-001-5(34) and (37), Cobb County

Author(s)
Report Number
6306
Year of Publication
1966
County
Abstract

The proposed projects would widen S.R.3/U.S.41/Cobb Parkway between northwest Atlanta and Merietta. The combined projects would begin at the intersection of S.R.3/U.S.41 and Paces Mill Road then would proceed northwesterly along S.R.3/U.S.41 to the South 120 Loop. A survey consistent with the proposed rights-of-way was surveyed for the entire 6.5 mile length of the project corridor. An archaeological survey (Level I) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No significant archaeological resources were located within the proposed project corridor as described in paragraph two above. It is concluded, therefore, that the project will have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.