Back to top

Archaeology Assessment of Project IR-75-3(164), Cobb County

Author(s)
Report Number
6312
Year of Publication
1963
County
Abstract

This is the reevaluation of the proposed reconstruction of the I-75/S.R. 120 Loop interchange. A corridor consistent with the proposed project rights-of-way was surveyed for the entire length of the project. An archaeological survey (Level I) was conducted in accordance with "GDOT Archaeological Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No significant archaeological resources were located within the proposed project corridor as described in paragraph two above. It is concluded, therefore, that the project would have no effect upon archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.