Back to top

Archaeological Assessment of Project MR-9103(5), Clayton County

Report Number
6529
Year of Publication
1948
Abstract

The proposed project consists of the widening and reconstruction of Panola Road/CR 1349 beginning at the intersection of Bouldercrest Road and ending at the intersection of Stagecoach Road. The existing right-of-way is 80 feet; the required right-of-way would be 110 feet. An archaeological survey (Level I) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred with by the Federal Highway Administration and State Historic Preservation Officer. These guidelines provide general survey boundaries and methodological approaches to archaeological surveys based on the type/scope of proposed highway projects and are followed during the initial identification of archaeological resources. No significant archaeological resources were located within the proposed corridor as described in paragraph two above. It is concluded, therefore, that the project will not affect archaeological resources on or eligible for inclusion in the NRHP provided that the project conforms to that described above.